English Dutch French German Irish Italian Japanese Portuguese Russian Spanish

A total of 7km of the old water distribution network must be replaced at Kilcormac, Co Offaly. Our crew are using Ditch Witch JT 30 machine and have directional drilled 1km of 125mm and 1km of 180mm new water main pipes to date.